Attachment B: Overview of Shanghai Pudong Data Center
Location | Pudong District of Shanghai, China
|
|
Building | Total floor space | Approx. 6,500m2 (equal to 1,000 racks) |
Structure and floors | Reinforced concrete construction with three floors above ground | |
Maximum load weight | 1,000 kg/m2 | |
Power | Power receiving |
|
Emergency power generator |
|
|
UPS |
|
|
Air conditioning |
|
|
Fire-extinguishing equipment |
|
|
Waterproof equipment |
|
|
Raised floor height | 800 mm | |
Security |
|
|
Other facilities | Conference rooms, refresh rooms, BCP offices, work space | |
Green ICT | Green measures |
|
Green index | PUE: 1.5 (designed value based on assumed conditions) | |
Communications environment | Multi-carrier | |
Maintenance service operation (24/365) |
|
|
Certifications (scheduled) | ISO27001, ISO9001 and ISO20000 | |
Tier level* | Tier III or above (change to Tier IV available) |
* NTT Com assessment based on Uptime Institute’s Tier Classification Define Site Infrastructure Performance